Jump to content

Talk:Performance-based contracting

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Removed further reading list[edit]

I've removed the further reading list as I don't think it adds any value (too old, too long, too focused on defence):

  • Aerospace Systems Division PBC Handbook [1]
  • Australian Department of Defence - ASDEFCON PBC Template [2]
  • Defence Materiel Organisation (DMO) - Contracting [3]
  • Adapted from - Performance Based Logistics Partnerships: Assessment of Implementation Methodologies for Selected ACAT 1 & 2 Systems AFLMA (Air Force Logistics Management Agency) Report (LM200400700)CAPT Kirk Pettingill and MAJ Michael A Knipper, October 2004
  • J. Boyce and A. Banghart, Performance based logistics and project point proof: A study of PBL effectiveness, Defense AT&L: Product Support Issue March–April 2012 - available online from [4]
  • J. Beggs, B. Ertel & M. Jones, Performance-based logistics perspective, Booz-Allen-Hamilton - available online from [5]
  • BAE Systems Australia 2011 - available online from [6]
  • Defence Industry Daily, December 6, 2011 - available online from [7]
  • Defence Materiel Organisation (DMO), Defence Capability Update, 8 June 2012 - available online from [8]
  • Defence Industry Daily, May 19, 2010 - available online from [9]
  • Society for Cost Analysis and Forecasting, Implementing Performance Based Contracting in Through Life Projects, John Scire and Dale Shermon, QinetiQ [10][permanent dead link]
  • World Bank, Resource Guide, Performance-based Contracting for the Preservation and Improvement of Road Assets - available online from [11]
  • National Cooperative Highway Research Program, Synthesis 389, Performance-Based Contracting for Maintenance 2009, available online from - [12]
  • Defence Materiel Organisation (DMO) Discussion Paper Contracting ‘Cost’ Models & Performance Based Contracting Concepts, 2010, available online from - [13]
  • T. Jin and P. Wang. Planning performance based contracts considering reliability and uncertain system usage. Journal of the Operational Research Society, vol. 63, 2012, pp. 1467–1478.
  • J.S. Kang, X.H. Zhang, J.S. Zhao and H.Z. Teng. Managing Performance Based Contract of Repairable System under Three Replacement Policies. 2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering .

EMsmile (talk) 11:35, 7 June 2024 (UTC)[reply]