Jakkur Cross metro station

Coordinates: 13°04′13″N 77°35′36″E / 13.07038°N 77.59347°E / 13.07038; 77.59347
From Wikipedia, the free encyclopedia

Jakkur Cross
Namma Metro station
General information
LocationJakkuru Layout, Byatarayanapura, Bengaluru, Karnataka 560092
Coordinates13°04′13″N 77°35′36″E / 13.07038°N 77.59347°E / 13.07038; 77.59347
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Kodigehalli railway station
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026; 2 years' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kodigehalli Blue Line
(Future Service and skipping Jakkur Plantation)
Yelahanka
Location
Map

Jakkur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will comprise of the main Phoenix Mall of Asia, Jakkur suburban area, Jakkur Aerodrome followed by many neighbouring areas like Kodigehalli, Jakkur Lake and Gandhi Krishi Vigyana Kendra, a Deemed-to-be-University in North Bengaluru, India. This metro station is slated to be operational around June 2026.[2][3][4][5]

Station layout[edit]

Station Layout - To Be Confirmed

Jakkur Cross track layout (TBC)
to Yelahanka **
P#
P#
Station with two tracks and two side platforms
**Skipping Jakkur Plantation
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board next station is Kodigehalli
Platform #
Northbound
Towards ← KIAL Terminals next station is Yelahanka (Skipping Jakkur Plantation)
Side platform | Doors will open on the left Disabled access
L2

Connections[edit]

Entry/Exit[edit]

See also[edit]

References[edit]

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.

External links[edit]

  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.