Rukungiri Water Supply and Sanitation Project

Coordinates: 00°51′10″S 29°59′08″E / 0.85278°S 29.98556°E / -0.85278; 29.98556
From Wikipedia, the free encyclopedia

Rukungiri Water Supply and Sanitation Project
Rukungiri Water Supply and Sanitation Project is located in Uganda
Rukungiri Water Supply and Sanitation Project
Location of Rukungiri Water Supply and Sanitation Project
Map
Desalination plant
LocationRukungiri, Rukungiri District, Western Uganda
Coordinates00°51′10″S 29°59′08″E / 0.85278°S 29.98556°E / -0.85278; 29.98556
Estimated output9,600 cubic meters (9,600,000 L) of water daily
CostUS$12 million (USh44 billion) (Phase I & II)
TechnologySedimentation, Chlorination

Rukungiri Water Supply and Sanitation Project (RWSSP), also Rukungiri Water Supply and Sewerage System, is a water intake, purification, distribution and waste water collection and disposal system in the town of Rukungiri, in the Western Region of Uganda. When completed, the system is expected to supply 9,600 cubic meters (9,600,000 L) of water daily, to about 120,000 people in the town of Rukungiri and neighboring communities in Rukungiri District and to parts of Ntungamo District. The infrastructure development project is being jointly funded by the World Bank and the Government of Uganda.[1][2]

Location[edit]

The new water treatment plant is located at Kabingo Village, Kebisoni Sub-county, in Rukungiri District.[2] Kebisoni is located about 12 kilometres (7 mi), southeast of downtown Rukungiri Town.[3]

History[edit]

In 2016, the World Bank and the Government of Uganda contracted the Indian company Technofab Engineering, to implement this project. However, as of March 2021, over five years since the contract was awarded, only an estimated 35 percent of work was completed, on a project that was planned to last two years.[1][2] In March 2021, the contract with the Indian contractor was terminated and National Water and Sewerage Corporation, was assigned the responsibility to complete the project.[1][2]

Overview[edit]

As part of efforts to avail adequate potable water to Rukungiri District, the government of Uganda, together with other development partners, devised the Rukungiri Water Supply And Sanitation Project. It is divided into two phases, Phase I and Phase II. The total budgeted cost of both phases is USh44 billion (approx. US$12 million).[4]

Phase 1[edit]

Phase 1 involves the construction of new intake of raw water at the Kahengye River, with a pumping station. The raw water to be pumped to a new water treatment plant at Kabingo Village, Kebisoni Sub-county. A new reservoir with capacity of 700 cubic meters (700,000 L) to be constructed at Mukazi Hill. A new administration building, a power generator and electromechanical house to be built. Laying of nearly 40 kilometres (25 mi) of distribution potable water mains.[1][2]

Phase 2[edit]

Phase II improvements include the construction of five reservoirs as illustrated in the table below. It also involves the construction of a waste lagoon and laying of 20 kilometres (12 mi) of potable water distribution mains. NWSC plans to build public toilets in Rukungiri town, to ease sewerage needs in the urban centre.[1][2]

Rukungiri Water and Sanitation Project: Phase II Components
Rank Reservoir Location Capacity Notes
1 Rwanyakashesha 1,000 cubic meters (1,000,000 L) [1][2]
2 Bwoma 300 cubic meters (300,000 L) [1][2]
3 Buyanja 400 cubic meters (400,000 L) [1][2]
4 Kebisoni 200 cubic meters (200,000 L) [1][2]
4 Rwerere 100 cubic meters (100,000 L) [1][2]

Other considerations[edit]

Following completion of Phase II, the entire system is designed to supply 9,600 cubic meters (9,600,000 L) of clean water daily. The population in Rukungiri District has need of potable water estimated at 3,000 cubic meters (3,000,000 L) daily. Before this project they were getting only 600 cubic meters (600,000 L) a day. The project is reported to cost USh$44 billion (approx. US$12 million).[4]

Completion[edit]

On 24 November 2022, the completed water supply and sanitation project was handed over to the Ugandan Ministry of Water and Environment by Engineer Silver Mugisha, the CEO of National Water and Sewerage Corporation (NWSC). NWSC served as the general contractor for this project. The water and sanitation parastatal was also selected to serve as the operations and maintenance contractor. The project is expected to serve an estimated 163,000 people in Rukungiri Town, parts of Rukungiri District and parts of Ntungamo District, at least until 2040.[5]

See also[edit]

References[edit]

  1. ^ a b c d e f g h i j Inès Magoum (11 March 2021). "Uganda: NSWC takes over Rukungiri water and sanitation project". Afrik21.africa. Paris, France. Retrieved 5 June 2022.
  2. ^ a b c d e f g h i j k Aziz Mohamed (15 March 2021). "Why Uganda's NSWC is taking over Rukungiri water supply project". Pumps-Afric.com. Retrieved 5 June 2022.
  3. ^ Google (5 June 2022). "Travel Distance Between Kebisoni, Uganda And Rukungiri, Uganda" (Map). Google Maps. Google. Retrieved 5 June 2022.
  4. ^ a b Ronald Kabanza (28 February 2021). "NWSC to take over construction of stalled multi-billion Rukungiri water project". Daily Monitor. Kampala, Uganda. Retrieved 5 June 2022.
  5. ^ Inès Magoum (25 November 2022). "Uganda: A new drinking water supply serves 163,000 people in Rukungiri". Afrik21.africa. Paris, France. Retrieved 30 November 2022.

External links[edit]