Atlantic Array

Coordinates: 51°16′19″N 3°39′43″W / 51.27194°N 3.66194°W / 51.27194; -3.66194
From Wikipedia, the free encyclopedia

Atlantic Array Offshore Wind Farm
Map
CountryEngland, United Kingdom
LocationBristol Channel, off North Devon and South Wales
Coordinates51°16′19″N 3°39′43″W / 51.27194°N 3.66194°W / 51.27194; -3.66194
StatusCancelled
Owner(s)RWE Npower Renewables
Wind farm
TypeOffshore
Max. water depth25–60 m (80–200 ft)
Distance from shore15.5 km (9.6 mi)
Site area200 km2 (77 sq mi)
Power generation
Units cancelledup to 240
Nameplate capacity1,200 MW
External links
Websitewww.rwe.com/web/cms/en/354738/rwe-innogy/sites/wind-offshore/developing-sites/atlantic-array-offshore-wind-farm/

Atlantic Array was a proposed offshore wind farm in the Bristol Channel, off the coast of North Devon and South Wales, United Kingdom. It was a development by RWE Npower Renewables. With a planned 1.2 gigawatt capacity, it would have been one of the world's largest offshore wind farms. The project was cancelled in November 2013.

Proposals[edit]

A site within the UK's third round of offshore wind developments, it was to be located 9.6 miles (15 km) off the coast of north Devon, and around 13.5 miles (22 km) off the coast of South Wales, quite close to the island of Lundy. Originally proposed by Farm Energy, now part of RWE npower renewables, the company won the lease development rights from the Crown Estate (which owns the UK seabed).[1][2]

The proposals included up to 240 wind turbines, which RWE npower said was enough to power up to 900,000 homes with renewable energy.[3] The capacity was expected to be 1.2 gigawatts, so it would have been one of the world's largest offshore wind farms.[1]

Planning and cancellation[edit]

Originally proposed in 2007,[1] the developers made a formal application on 14 June 2013 for a Development Consent Order under the 2008 Planning Act, which would have required a decision (by the Secretary of State for Energy and Climate Change) in autumn 2014. The developers announced the cancellation of the wind farm on 25 November 2013, citing technical and financial reasons.[4]

The wealth of data and information that was gathered as part of the process of planning and assessing the impact of the wind farm is now available online for free using The Crown Estate's Marine Data Exchange.[5]

References[edit]

  1. ^ a b c "Largest offshore windfarm planned". BBC. 16 May 2007. Retrieved 16 August 2016.
  2. ^ "RWE Innogy - Atlantic Array". www.rwe.com. Retrieved 16 August 2016.
  3. ^ "Largest offshore windfarm planned". BBC News. 16 May 2007. Archived from the original on 15 January 2009. Retrieved 6 February 2009.
  4. ^ "Atlantic Array wind farm dropped by developer". BBC. 26 November 2013. Retrieved 28 November 2013.
  5. ^ "Marine Data Exchange". The Crown Estate.