WikiProject iconThis disambiguation page is within the scope of WikiProject Disambiguation, an attempt to structure and organize all disambiguation pages on Wikipedia. If you wish to help, you can edit the page attached to this talk page, or visit the project page, where you can join the project or contribute to the discussion.

Untitled[edit]

Mirza Masood is a Qadiyani not a Muslim nor current khalifs of Muslims

Lefting incedent[edit]

On May 5th at DS5 - D&D project Lifting operations were carried out in the D&D Area of DS5 station, the lifting operation was for one container in confined area, as per lifting plan And ROO procedure , container should be lifted from down side , but there was not enough space to install the lifting accessories from below , they put lifting gears from top side without using saperorder beam , during the visit of the person concerned with the lifting of the GCMC , he found that they are using outrigger with incorrect size and it’s not match for dimensions . The occurrence of such an Incident is a clear failure in the work of the lifting operations system, and we will be serious in dealing with such observations and follow the Important Point . 1:The lifting plan and contents shall be sent to the ROO Lifting Engineer three days prior to the commencement of all lifting operations. 2:all safety critical check lists are to be completed before any lifting operations are carried out. 3:Lifting operations are carried out in strict accordance with ROO's lifting procedures. Critical lifting operations require strict compliance with the lifting plan. The lifting checklist must be completed before routine lifting operations that do not require lifting plans. 4:Before lifting operation, the crane and sling should be comprehensively checked in advance to ensure that the crane performance and condition is good. The sling is in good condition. And have been tested and certified by the relevant third party. Operation, the crane and sling should be comprehensively checked in advance to ensure that the crane performance and condition is good. The sling is in good condition. And have been tested and certified by the relevant third party. 5:The operators involved in lifting have participated in lifting training and obtained relevant operation certificates. Including Banks man and rigger and crane operators . 82.199.209.74 (talk) 21:35, 6 May 2023 (UTC)[reply]