Cumbernauld railway station

Coordinates: 55°56′30″N 3°58′51″W / 55.9418°N 3.9807°W / 55.9418; -3.9807
From Wikipedia, the free encyclopedia

Cumbernauld

Scottish Gaelic: Comar nan Allt[1]
National Rail
Cumbernauld railway station (northbound platform)
General information
LocationCumbernauld, North Lanarkshire
Scotland
Coordinates55°56′30″N 3°58′51″W / 55.9418°N 3.9807°W / 55.9418; -3.9807
Grid referenceNS763738
Managed byScotRail
Transit authoritySPT
Platforms2
Other information
Station codeCUB
Fare zoneS6/S8
History
Original companyCaledonian Railway
Pre-groupingCaledonian Railway
Post-groupingLondon, Midland and Scottish Railway
Key dates
7 August 1848[2]Opened
August 1849[2]Closed
April 1870[2]Reopened
Passengers
2018/19Decrease 0.206 million
 Interchange Increase 6,527
2019/20Decrease 0.200 million
 Interchange Decrease 5,749
2020/21Decrease 23,674
 Interchange Decrease 621
2021/22Increase 0.107 million
 Interchange Increase 2,358
2022/23Increase 0.140 million
 Interchange Increase 3,445
Notes
Passenger statistics from the Office of Rail and Road

Cumbernauld railway station serves the town of Cumbernauld, Scotland. The station is managed by ScotRail and is located on the Cumbernauld Line, 14 miles (23 km) north east of Glasgow Queen Street (High Level) station and the Motherwell to Cumbernauld Line, 11+34 miles (18.9 km) north of Motherwell. Trains serving the station are operated by ScotRail.

The patronage at Cumbernauld station does not compare well with that of stations in similar towns such as East Kilbride, possibly due to the awkward position on the southeastern periphery of the town, around a 20-minute walk from the town centre.[3] Other residential areas (including Westfield and Balloch) are closer to Croy, while Condorrat and Greenfaulds are served by Greenfaulds railway station. Some areas like the Village or Abronhill are not within reasonable walking distance of a station, although Abronhill is close to the line, which has recently been electrified.

History[edit]

Caley main line

The station was built by the Caledonian Railway and opened on 7 August 1848[4] on their line from Gartsherrie (on the former Garnkirk and Glasgow Railway) to Greenhill on the Scottish Central Railway. The line gave the Caledonian access to central & north eastern Scotland from Glasgow and its main line from Carlisle, but the station at Cumbernauld wasn't a commercial success as the village it served wasn't particularly large; and so it closed after just one year of operation. It was eventually reopened in 1870 to be served by local passenger services from Glasgow Buchanan Street on the lines toward Falkirk & Stirling.

When planning the new town in the 1950s, there was some consideration made to siting the town centre near the current railway station rather than on the hill top. The railway station in this scheme would then have been moved to the Luggie and Shank valley near the A73, beyond Lenziemill and Blairlinn.[5]

However, it wasn't until the after the building of the new town started that the area's population began to expand significantly, and usage of the station increased. This also ensured that the station avoided the Beeching Axe in the early 1960s, even though (as noted) it wasn't particularly well sited for many of the newly built residential developments.

The line did though lose its direct link with the city after the closure to passengers of the Buchanan Street terminus in November 1966.[6] The diversion of all main line expresses and the remaining local routes into Queen Street left the station without any trains serving it, and so a replacement service had to be introduced. This consisted of a DMU shuttle along the old main line into Glasgow, which was still operational as far as the works at St Rollox; however, just east of there they were re-routed onto the former Edinburgh and Glasgow Railway's Sighthill Branch to Cowlairs, which they used as far as Springburn. Trains terminated there, with passengers having to change onto North Clyde Line electric services over the former City of Glasgow Union Railway branch to Bellgrove and Queen Street Low Level.

Regular local services southwards towards Coatbridge Central and Motherwell had also ceased by this time, although a limited number of longer distance trains continued to call there - notably the London Euston to Inverness Clansman & Royal Highlander expresses from the early 1970s onwards.

Through running to Queen Street High Level was eventually introduced in 1989, and since then several intermediate local stations along the line have reopened with backing from the Strathclyde Passenger Transport Executive. Services both northwards to Falkirk Grahamston (September 1999) and southwards to Motherwell (May 1996) have also been reintroduced, whilst the opening of the Cowlairs Chord in 1993 meant that services could now proceed directly to Queen Street without having to reverse alongside the depot at Eastfield as before. The lines to Glasgow & Coatbridge have been electrified (as part of the Edinburgh to Glasgow Improvement Programme), with electric operation beginning in the spring of 2014. This has seen service frequencies on the Glasgow line increased to three per hour, and through running on electric services to the west end of Glasgow via the North Clyde Line through Queen Street Low Level. The station building is also undergoing major refurbishment as part of this work, with a new modular structure opened in July that year.[7]

Further electrification northwards to Greenhill Junction is due for completion in 2018 (as part of the next phase of the EGIP), which will coincide with a further planned timetable recast that will see the existing service to Falkirk doubled to two trains per hour and extended through to Edinburgh Waverley via Polmont. This will see the town given direct links to the Scottish capital for the first time, as well as upping the Glasgow Queen Street service frequency to four trains per hour. The timetable upgrade & infrastructure work is being funded by Transport Scotland.[8]

Services[edit]

2017[edit]

Off-Peak Monday to Saturday:

  • 2tph to Dumbarton Central via Springburn and Glasgow Queen Street low level.
  • 1tph to Glasgow Queen Street high level.
  • 1tph to Falkirk Grahamston.
  • 1tph to Dalmuir via Motherwell and Glasgow Central Low Level

On Sundays there is an hourly service to Partick via Springburn and Glasgow Queen Street low level.[9]

2023[edit]

On Monday to Saturdays, There is a half hourly service southbound to Glasgow Queen Street and an hourly service to Dalmuir, There is also an hourly service northbound to Falkirk Grahamston.


On Sundays there is an hourly service to Glasgow but no service to Dalmuir or Falkirk Grahamston but connections for these stations can be made in Glasgow

Preceding station National Rail National Rail Following station
Greenfaulds   ScotRail
Motherwell–Cumbernauld line
  Terminus
Greenfaulds   ScotRail
Cumbernauld Line
  Camelon
  Historical railways  
Greenfaulds
Line and Station open
  CR Main Line
Caledonian Railway
  Greenhill Lower
Line open; Station closed
    Bonnybridge
Line partially open; Station closed

Signalling[edit]

Cumbernauld signal box, which had 35 levers, was located to the north of the station, on the east side of the line. Latterly it worked by Absolute Block to Greenfoot S.B. and by Track Circuit Block to Greenhill Junction S.B. Its primary function was to operate the crossover and reversing siding used by services that terminated & started back from here. This is still in use today.

Cumbernauld signal box closed on 3 May 1999, when the line was resignalled with colour light signals controlled from Cowlairs Signalling Centre.

Gallery[edit]

References[edit]

Notes[edit]

  1. ^ Brailsford 2017, Gaelic/English Station Index.
  2. ^ a b c Butt 1995, p. 74.
  3. ^ "Cumberanuld". Trainline. Retrieved 10 August 2018.
  4. ^ "170th anniversary of rail station opening". Cumbernauld News. 9 August 2018. Retrieved 10 August 2018.
  5. ^ Taylor, Jessica (2010). Cumbernauld: The Conception, Development and Realisation of a Post-war British New Town (PDF). Edinburgh: Edinburgh College of Art. pp. 201–208. Retrieved 25 February 2017.
  6. ^ Railscot - Buchanan Street Extension Railscot; Retrieved 2014-01-28
  7. ^ "On the right tracks; work sees major change at Cumbernauld train station" Archived 19 May 2014 at the Wayback Machine Campbell, Scott Cumbernauld Media news article 19-05-2014; Retrieved 2014-05-19
  8. ^ "'Rail revolution’ means 200 more services and 20,000 more seats for Scots passengers" Archived 2016-08-20 at the Wayback Machine Transport Scotland press release 15 March 2016; Retrieved 18 August 2016
  9. ^ GB National Rail Timetable May–December 2016, Table 226 (Network Rail)