Breich railway station

Coordinates: 55°49′39″N 3°40′03″W / 55.8275°N 3.6675°W / 55.8275; -3.6675
From Wikipedia, the free encyclopedia

Breich

National Rail
General information
LocationBreich, West Lothian
Scotland
Coordinates55°49′39″N 3°40′03″W / 55.8275°N 3.6675°W / 55.8275; -3.6675
Grid referenceNS956606
Managed byScotRail
Platforms2
Other information
Station codeBRC
Key dates
9 July 1869Opened[2]
Passengers
2018/19Increase 342
2019/20Increase 2,550
2020/21Decrease 220
2021/22Increase 3,638
2022/23Increase 4,484
Notes
Passenger statistics from the Office of Rail and Road

Breich railway station is a rural railway station serving the village of Breich in West Lothian, Scotland. It is located on the Shotts Line, 21 miles (34 km) west of Edinburgh Waverley towards Glasgow Central. It was the sixth-least-used station in the UK until 2018-19 and was the second-least-used in Scotland, after Barry Links as well as being the least used station in West Lothian.[3][4]

History[edit]

The station was opened by the Caledonian Railway on their Cleland and Midcalder Line on 9 July 1869.[2] Breich is named after the nearby Breich Water.[5] The station pre-dates the present-day (2015) village of Breich and OS maps show that it has never possessed freight facilities such as loading docks and sidings, etc.[5]

The station in 1962

The surrounding area, although now very rural, was once highly industrialised with several collieries, lime works, iron workings, etc. nearby, together with the Levenseat Branch of the North British Railway and the originally 4 ft 6in Scotch gauge Wilsontown, Morningside and Coltness line with its old terminus station of Longridge[5] opened in 1845 and closed in 1848.[6]

A ticket office and waiting room was still present in 1962 as shown by the photograph of that date, together with a linesman's brick hut building, both on the Glasgow bound platform. The final section of the platforms running towards Edinburgh was slightly higher, had larger edging stones and were of a different construction suggesting that they were built at a different date than the rest of the platforms. The station gardens had an unusual diversity of planted shrubs and trees.

The station was rebuilt on the same site in 2018 and it has lost the old pedestrian overbridge and wooden shelter. It has new platforms, two modern style passenger shelters, additional outside seating and electronic travel information displays. Access from platform 1 to 2 is via the rebuilt road overbridge. The car parking area is unchanged and the access is ill-defined due to the presence of a crossroads and traffic lights.

Services[edit]

Preceding station National Rail National Rail Following station
Addiewell   ScotRail
Shotts Line
  Fauldhouse
  Historical railways  
Addiewell
Line and station open
  Caledonian Railway
Cleland and Midcalder Line
  Fauldhouse
Newpark
Loop line
and station closed
  Caledonian Railway
Cleland and Midcalder Line
Addiewell Loop
 

2011[edit]

Mondays to Saturdays saw one train to Edinburgh and two towards Glasgow Central with no Sunday service.

2018[edit]

Monday to Saturdays the station was served by one eastbound towards Edinburgh and one westbound train towards Glasgow Central per day. There was no Sunday service.[7]

2019[edit]

From May 2019, an hourly service has been introduced Monday - Saturday and a 2 hourly service on Sundays.

Station usage[edit]

In 2014–15, Breich was the tenth least-used station in Britain, with 92 passenger exits and entries.[8]

West Lothian Council's Route Utilisation Strategy suggests that if there was an increase in service frequency on the Shotts Line more services could stop at Breich. This could help future developments in the Breich and Longridge areas.[9]

Proposed closure[edit]

On 21 June 2017, Network Rail announced that they had begun consultation on the proposed closure of the station due to low patronage and if retained will avoid heavy expenditure to update the station prior to electrification of the line.[10][11] It would have been the first station in Scotland to close in over 30 years.[11]

The overwhelming response to the consultation was in favour of keeping Breich station open. Many respondents wished to see more services calling at Breich Station to increase patronage. It has been confirmed that the station will remain open and plans are being developed to possibly improve services. This however appears to be false as patronage has actually fallen since the improvement in service.[12][13]

The station was closed temporarily from 23 June 2018 for 12 weeks during redevelopment as part of a £2.4 million project to make it suitable for new electric trains. The redevelopment included work to the platforms in order to make them compliant in both height and length for the new services as well as ensuring ramped access to both platforms and to station facilities such as waiting shelters, CCTV, etc... The footbridge was removed at this time with access gained from the upgraded road overbridge.[14][15]

References[edit]

Notes[edit]

  1. ^ Brailsford 2017, Gaelic/English Station Index.
  2. ^ a b Butt (1995), page 43
  3. ^ "Station usage 2013-14 data | Office of Rail and Road".
  4. ^ "Least used railway station Redcar British Steel gets visitor boost". BBC News. 14 January 2020.
  5. ^ a b c "View: Linlithgowshire Sheet XII.SW (includes: West Calder; Whitburn) - Ordnance Survey Six-inch 2nd and later editions, Scotland, 1892-1960". maps.NLS.uk. Retrieved 6 December 2017.
  6. ^ Butt (1995), page 149
  7. ^ Table 224 National Rail timetable, May 2016
  8. ^ "Revealed: Britain's busiest and quietest stations". BBC News. 15 December 2015.
  9. ^ "Network Rail - resource not found" (PDF). www.NetworkRail.co.uk. Archived from the original (PDF) on 4 March 2016. Retrieved 6 December 2017.
  10. ^ "Breich station: proposed closure – public consultation – Network Rail". www.NetworkRail.co.uk. Archived from the original on 6 December 2017. Retrieved 6 December 2017.
  11. ^ a b "Station with three passengers faces closure". BBC News. BBC. 22 June 2017. Retrieved 22 June 2017.
  12. ^ "Transport User Voice – What's happening in Scotland? - Transport Focus". TransportFocus.org.uk. Retrieved 6 December 2017.
  13. ^ Caton, Peter. Remote Stations.
  14. ^ "Breich Station closure is platform for £2.4m redevelopment". Network Rail Media Centre.
  15. ^ "UK railway news round-up". Railway Gazette.

Sources[edit]

External links[edit]