McCowan station

Coordinates: 43°46′29.7″N 79°15′06″W / 43.774917°N 79.25167°W / 43.774917; -79.25167
From Wikipedia, the free encyclopedia
(Redirected from McCowan (TTC))

McCowan
Station platform
General information
Location1275 McCowan Road
Toronto, Ontario
Canada
Coordinates43°46′29.7″N 79°15′06″W / 43.774917°N 79.25167°W / 43.774917; -79.25167
PlatformsSide platforms
Tracks2
Connections
  •  9  Bellamy
  •  16  McCowan
  •  38  Highland Creek
  •  129  McCowan North
  •  130  Middlefield
  •  131  Nugget
  •  132  Milner
  •  133  Neilson
  •  134  Progress
  •  169  Huntingwood
  •  302   Kingston Rd - McCowan
  •  913  Progress Express
Durham Region Transit DRT
Construction
Structure typeElevated
AccessibleNo
Other information
WebsiteOfficial station page
History
OpenedMarch 22, 1985; 39 years ago (1985-03-22)
ClosedJuly 24, 2023; 8 months ago (2023-07-24)[1]
Passengers
2019[2]3,659
Rank71 of 75
Services
Preceding station Toronto Transit Commission Following station
Scarborough Centre
towards Kennedy
Line 3 Scarborough Terminus
Location
Map

McCowan was a terminal station on Line 3 Scarborough of the Toronto subway. The closed station is located at 1275 McCowan Road, just north of Ellesmere Road at Bushby Drive/Town Centre Court.

In February 2021, the Toronto Transit Commission (TTC) recommended the closure of Line 3 in November 2023 and its replacement by bus service until the completion of the Scarborough extension of Line 2 Bloor–Danforth.[3][4] However, this station permanently closed following a derailment on July 24, 2023, after which the TTC decided not to reopen Line 3 service.[1]

Station description[edit]

The station structure was built on three levels: Line 3 was on the upper floor, an automatic entrance from the Consilium Place office complex via the Pedway pedestrian walkway was on the second floor, and the station entrance from McCowan Road with the collector and the concourse was on the lower floor. At the time of its closure, 15 TTC bus routes (13 daytime routes and 2 Blue Night routes) plus one Durham Region Transit bus route passed by McCowan station.[5]

Rapid transit infrastructure in the vicinity[edit]

McCowan station was the terminus station of Line 3 and lay just west of McCowan Yard (completed in 1983), which stored and maintained Line 3's trains.

Trains used a double crossover before the station entrance, but only one side of the station was used. In earlier years both platforms were used for line-end and westbound trains, but the double crossover allowed eastbound trains to cross over to the westbound platform, making for a more efficient system. The eastbound track was used when taking trains out of service. This allowed the operator to ensure that the train was empty with no one boarding before bringing the train to McCowan Yard.

Concourse of the station

References[edit]

  1. ^ a b Reporter, Lex Harvey Transportation (August 24, 2023). "TTC ends Scarborough RT service permanently". Toronto Star. Retrieved August 24, 2023.
  2. ^ "Subway ridership, 2019" (PDF). Toronto Transit Commission. Archived (PDF) from the original on November 28, 2022. Retrieved January 30, 2023. This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.
  3. ^ Spurr, Ben; Pagliaro, Jennifer (February 4, 2021). "TTC recommends seven years of shuttle buses on Scarborough RT ahead of 2030 subway opening". Toronto Star. Archived from the original on February 4, 2021. Retrieved February 4, 2021.
  4. ^ "Toronto Transit Commission Report - Scarborough RT Strategic Plan" (PDF). Toronto Transit Commission. Archived (PDF) from the original on August 26, 2014. Retrieved September 1, 2014. Subway Eliminates:McCowan, Midland and Ellesmere
  5. ^ "McCowan Station". Toronto Transit Commission. Archived from the original on August 28, 2023. Retrieved August 27, 2023.

External links[edit]