File:San Agustine Bridge Malisik River Views5.jpg

Page contents not supported in other languages.
This is a file from the Wikimedia Commons
From Wikipedia, the free encyclopedia

Original file(4,096 × 3,072 pixels, file size: 1.92 MB, MIME type: image/jpeg)

Summary

San Agustine Bridge, Candaba in February, 2024 with P 91 million slope protection works at Malisik River Dike or channel of the Pampanga River Rio Grande in San Agustin, Candaba at the foot of majestic Mount Arayat (On May 21, 2016 Candaba’s P30 million San Agustin (Bomba) Bridge approach collapsed due to alleged poor engineering design. It was retrofitted and rehabilitated).

Licensing

I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

image/jpeg

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:31, 15 February 2024Thumbnail for version as of 08:31, 15 February 20244,096 × 3,072 (1.92 MB)Valenzuela400Side exit
08:31, 15 February 2024Thumbnail for version as of 08:31, 15 February 20244,096 × 3,072 (1.78 MB)Valenzuela400Exit
08:29, 15 February 2024Thumbnail for version as of 08:29, 15 February 20244,096 × 3,072 (1.6 MB)Valenzuela400San Agustine Bridge, Candaba in February, 2024 with P 91 million slope protection works at Malisik River Dike or channel of the Pampanga River Rio Grande in San Agustin, Candaba at the foot of majestic Mount Arayat (On May 21, 2016 Candaba’s P30 million San Agustin (Bomba) Bridge approach collapsed due to alleged poor engineering design. It was retrofitted and rehabili...
The following pages on the English Wikipedia use this file (pages on other projects are not listed):