File:Architect and engineer (1933) (14782318524).jpg

Page contents not supported in other languages.
This is a file from the Wikimedia Commons
From Wikipedia, the free encyclopedia

Original file(1,638 × 2,422 pixels, file size: 927 KB, MIME type: image/jpeg)

Summary

Description
English:
Dry point etching of the Golden Gate Bridge (made before its construction); by Chesley Bonestell

Identifier: architectenginee11333sanf (find matches)
Title: Architect and engineer
Year: 1905 (1900s)
Authors:
Subjects: Architecture Architecture Architecture Building
Publisher: San Francisco : Architect and Engineer, Inc
Contributing Library: San Francisco Public Library
Digitizing Sponsor: San Francisco Public Library

View Book Page: Book Viewer
About This Book: Catalog Entry
View All Images: All Images From Book
Click here to view book online to see this illustration in context in a browseable online version of this book.

Text Appearing Before Image:
per than the -20 eleva-tion set for the pier base. Meanwhile two modern aggregate batch-ing plants were built—one on the Marinside of the Golden Gate and one on theSan Francisco side, just west of CrissyField. Both these plants were in readiness fordelivery of concrete to mixer-body truckslong before needed and with the comple-tion of excavations for the Marin pier thepouring of concrete was started withoutdelay. Over 30,000 barrels of Golden GatePortland cement were used to complete thehuge structure, dimensions of which are80x160 feet at the base. 65x134 feet at thetop and 64 feet in height. More than213,600 pounds of tower anchorage steelwas impedded in the mass. Pier Finished Ahead of Time The Marin pier was completed ahead ofschedule on June 29, 1933, and turned overto the Golden Gate Bridge and HighwayDistrict by the Pacific Bridge Co., whichholds the contracts for the two main piersIts actual cost was $405,000. THE ARCHITECT AND ENGINEER ^ 43 ► AUGUST. NINETEEN THIRTY-THREE
Text Appearing After Image:
Cciirlrsy ol losepli B. Slrauss, Chkj Engineer DRY POINT ETCHING OF THE GOLDEN GATE BRIDGEBY CHESLEY BONESTELL THE ARCHITECT AND ENGINEER -^ 44 ► AUGUST, NINETEEN THIRTY-THREE While work on the Marin pier wasunder way, excavations were being madefor the San Francisco pier and the twocable anchorages on either side of theGolden Gate. The anchorage contract, held by the SanFrancisco firm of Barrett and Hilp. in-volves the handling of appro.ximately 238.-000 cubic yards of earth and rock and theplacing of 127,290 cubic yards of concrete. As of July 1st, 1933, the Marin anchor-age 26.8 per cent completed, with the baseblock concrete poured and the placing ofthe cable anchorage steel well under way. Excavation for the San Francisco an-chorage as of the same date was approxi-mately 40 per cent completed, with a newsea wall, to replace the original one thatsurrounded Fort Winfield Scott virtually100 per cent complete. Construction of thissea wall necessitated the removal and stor-age of hu

Note About Images

Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original work.
Date
Source

https://www.flickr.com/photos/internetarchivebookimages/14782318524/

Author Internet Archive Book Images
Permission
(Reusing this file)
At the time of upload, the image license was automatically confirmed using the Flickr API. For more information see Flickr API detail.
Volume
InfoField
1933
Flickr tags
InfoField
  • bookid:architectenginee11333sanf
  • bookyear:1905
  • bookdecade:1900
  • bookcentury:1900
  • booksubject:Architecture
  • booksubject:Building
  • bookpublisher:San_Francisco___Architect_and_Engineer__Inc
  • bookcontributor:San_Francisco_Public_Library
  • booksponsor:San_Francisco_Public_Library
  • bookleafnumber:337
  • bookcollection:sanfranciscopubliclibrary
  • bookcollection:americana
Flickr posted date
InfoField
30 July 2014


Licensing

This image was taken from Flickr's The Commons. The uploading organization may have various reasons for determining that no known copyright restrictions exist, such as:
  1. The copyright is in the public domain because it has expired;
  2. The copyright was injected into the public domain for other reasons, such as failure to adhere to required formalities or conditions;
  3. The institution owns the copyright but is not interested in exercising control; or
  4. The institution has legal rights sufficient to authorize others to use the work without restrictions.

More information can be found at https://flickr.com/commons/usage/.


Please add additional copyright tags to this image if more specific information about copyright status can be determined. See Commons:Licensing for more information.
This image was originally posted to Flickr by Internet Archive Book Images at https://flickr.com/photos/126377022@N07/14782318524. It was reviewed on 21 September 2015 by FlickreviewR and was confirmed to be licensed under the terms of the No known copyright restrictions.

21 September 2015

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

image/jpeg

0db0d49b3107332c8573784f0a39932ef7f916d1

949,090 byte

2,422 pixel

1,638 pixel

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:49, 21 September 2015Thumbnail for version as of 16:49, 21 September 20151,638 × 2,422 (927 KB)== {{int:filedesc}} == {{information |description={{en|1=<br> '''Identifier''': architectenginee11333sanf ([https://commons.wikimedia.org/w/index.php?title=Special%3ASearch&profile=default&fulltext=Search&search=insource%3A%2Farchitectenginee11333sanf%...
The following pages on the English Wikipedia use this file (pages on other projects are not listed):