Elveden Centre

Coordinates: 51°02′49″N 114°04′46″W / 51.04694°N 114.07944°W / 51.04694; -114.07944
From Wikipedia, the free encyclopedia
(Redirected from Elveden Centre (Calgary))
Elveden Centre
Elveden Centre
Map
General information
TypeOffice
LocationCalgary
Canada
Coordinates51°02′49″N 114°04′46″W / 51.04694°N 114.07944°W / 51.04694; -114.07944
Construction started1959
Completed1960 (Elveden House)
1961 (BAO Building)
1964 (Guinness House)
Cost$14,500,000
Height
Roof80 m (260 ft)
Technical details
Floor count20
Floor area41,603 m2 (447,810 sq ft)
Design and construction
Architect(s)Rule, Wynn, Rule
Main contractorCommonwealth Construction

Elveden Centre is a three-tower office building located at 717 7th Avenue Southwest in Calgary, Alberta. Designed by Alberta architectural firm Rule Wynn and Rule and built in three phases between 1959 and 1964, it is one of Calgary's best examples of International-style architecture.

History and design[edit]

During the boom following the discovery of Leduc No. 1 on 13 February 1947, the area of downtown Calgary west of 4th Street saw the construction of many new office buildings intended to house the oil companies that had moved into the city. These buildings included the Barron Building (1947), Petro Chemical Building (1956), Triad Oil Building (1956), Britannia Building (1958), Petro-Fina Building (1959), and Dome Oil Building (1959).

Elveden was commissioned by British Pacific Building, a company owned by the Guinness family. The family at that time had interests in the Calgary companies Duke Drilling Investment Company and Seabridge Investments. Albertan architectural firm Rule Wynn and Rule was hired for the project. Construction, done by the Commonwealth Construction Company, began in 1959. Steel was provided by the Dominion Bridge Company. In order for the project to commence, the City of Calgary had to amend a restriction that limited buildings to twelve stories.

The first and central tower, Elveden House, was built between 1959 and 1960. It is named after the Guinness's estate in Suffolk, which itself is named after half of Benjamin Guinness's peer, Viscount Elveden. The second tower, Iveagh House, on the east side, was built between 1960 and 1962 and is named after the other half of Benjamin Guinness's peer, the Earl of Iveagh. The third tower, Guinness House, on the west side, was built between 1962 and 1964 and is named after the Guinness family.

The complex has 447,814 sq ft (41,603.3 m2) of office space, with 172,081 sq ft (15,986.8 m2) in the main tower.

In 2005, the Calgary Heritage Authority added Elveden House to its list as a Category A (top priority) site.[1][2]

References[edit]

  1. ^ Emporis Buildings (2007). "Elveden House". Archived from the original on March 24, 2007. Retrieved 2007-04-11.
  2. ^ Calgary Heritage Authority (October 2005). "Evaluation & Review Committee Minutes" (PDF). Archived from the original (PDF) on 2007-09-30. Retrieved 2007-04-11.